D.M. Lei, X.P. Guo, An effective neighborhood search for scheduling in dual resource constrained interval job shop with environmental objective, International Journal of Production Economics, 159: 296-303, 2015.
Hits:
Translation or Not:no
Pre One:Xiuping Guo, Deming Lei, Bi-objective job shop scheduling with outsourcing options[J], International Journal of Production Research (IJPR), 52(13), 3832–3841. 2014.
Next One:D.M. Lei, X.P. Guo, Variable neighborhood seaarch for the second type of two-sided assembly line balancing problem, Computers and Operations Research, 72(C) :183-188, 2016.
Opening Time:..
The Last Update Time: ..