Shuwei Wang, Xiuping Guo*, An efficient hybrid artificial bee colony algorithm for disassembly line balancing problem with sequence-dependent part removal times, Engineering Optimization, 1(1)1-19, 2019.
Hits:
Translation or Not:no
Pre One:D.L. Lei, Y.L. Zheng, X.P. Guo*, A shuffled frog leaping algorithm for flexible job shop scheduling with the consideration of energy consumption, International Journal of Production Research (IJPR), 55(11): 3126-3140, 2017.
Next One:Xiuping Guo, Deming Lei, Bi-objective job shop scheduling with outsourcing options[J], International Journal of Production Research (IJPR), 52(13), 3832–3841. 2014.
Opening Time:..
The Last Update Time: ..